Shipley Community Hub – Refurbishment, Alterations & Extensions

Project Value
£3,000,000.00

Duration
12 months

Sector
Leisure

This flagship project formed part of the Shipley Towns Fund in order refurbish and extend the Sustainable Community Hub. A total of four new extensions were constructed to maximise the space within the site for its users and create two new eye-catching entrances into the ground and first floor. An issue for the building users previously, was that there was no link between each floor. This project eradicated this issue by installing a new bespoke staircase and platform lift. The original features were kept with innovative design ideas between our project team and the architect, such as, the Victorian window shapes around the external envelope of the building. Extensive refurbishments were undertaken within the building itself with new walls, ceilings, decorations, floor coverings, kitchen and M&E system installed.

Shipley Community Hub – Refurbishment, Alterations & Extensions

Project Value
£3,000,000.00

Duration
12 months

Sector
Leisure

This flagship project formed part of the Shipley Towns Fund in order refurbish and extend the Sustainable Community Hub. A total of four new extensions were constructed to maximise the space within the site for its users and create two new eye-catching entrances into the ground and first floor. An issue for the building users previously, was that there was no link between each floor. This project eradicated this issue by installing a new bespoke staircase and platform lift. The original features were kept with innovative design ideas between our project team and the architect, such as, the Victorian window shapes around the external envelope of the building. Extensive refurbishments were undertaken within the building itself with new walls, ceilings, decorations, floor coverings, kitchen and M&E system installed.

We’d love to discuss your project, whatever stage you’re at,
Whitaker & Leach can help.

Contact us and let us make a difference.