Henry Moore Institute, Leeds – Remodelling Works
Project Value
£550,000.00
Duration
4 months
Sector
Leisure

This project involved the remodelling and refurbishment of the Henry Moore Institute in Leeds to create a more vibrant, open space in the libraries and staff welfare facilities. The project had its difficulties with the building located in Leeds City Centre, which created issues with deliveries and site setup. Our project team was able to overcome these challenges and deliver an outstanding finish that we could all be proud of. Our in-house joinery workshop manufactured all the bespoke joinery items including the curved seating area, oak screens and doors as well as the internal timber flooring. All of which was installed by our joinery team. A new mechanical & electrical system was installed throughout the building.



Henry Moore Institute, Leeds – Remodelling Works
Project Value
£550,000.00
Duration
4 months
Sector
Leisure

This project involved the remodelling and refurbishment of the Henry Moore Institute in Leeds to create a more vibrant, open space in the libraries and staff welfare facilities. The project had its difficulties with the building located in Leeds City Centre, which created issues with deliveries and site setup. Our project team was able to overcome these challenges and deliver an outstanding finish that we could all be proud of. Our in-house joinery workshop manufactured all the bespoke joinery items including the curved seating area, oak screens and doors as well as the internal timber flooring. All of which was installed by our joinery team. A new mechanical & electrical system was installed throughout the building.